Professional installation, configuration, testing, and validation to ensure UPS systems operate correctly from day one and meet design performance specifications.
1,200+
UPS systems installed
99.7%
First-time success rate
48 Hrs
Average project turnaround
Zero
Unplanned downtime goal

ISO 9001 Certified
Quality management standards
Commissioning is the systematic process of verifying that a newly installed UPS system meets design specifications and operational requirements. It ensures every component — from input connections to battery strings — functions correctly before your facility depends on it.
Installation involves physical placement and electrical connections. Commissioning goes further — verifying proper operation under all modes, stress testing transfer mechanisms, validating battery backup times, and documenting baseline performance for future comparison.
Nearly 30% of UPS failures can be traced back to improper installation or configuration. Issues that go undetected — like incorrect battery connections, inadequate ventilation, or misconfigured transfer settings — can lead to catastrophic failures during a real power event. Proper commissioning identifies and corrects these issues before they become costly problems.
Installation Verification
Confirms proper mechanical and electrical connections, grounding, and environmental compliance
Warranty Activation
Ensures all manufacturer requirements are met for full warranty coverage
Baseline Documentation
Establishes initial performance benchmarks for future monitoring and maintenance
End-to-end project management from site survey through final acceptance testing
Detailed site surveys, load calculations, electrical infrastructure assessment, and coordination with general contractors and utilities.
Professional rigging, positioning, anchoring, battery cabinet assembly, and cable tray installation by certified installers.
Input/output connections, battery wiring, bypass circuits, ground fault protection, and integration with building electrical systems.
Firmware programming, voltage/frequency settings, battery parameters, alarm thresholds, and network integration with monitoring systems.
Comprehensive verification of all operating modes: normal, battery, bypass, generator, maintenance bypass, and emergency power-off (EPO).
Operator training, maintenance procedures, as-built drawings, test reports, and warranty registration for facility staff.
Our commissioning follows recognized industry standards and best practices
NFPA 70 (NEC), 70B (Maintenance), 70E (Arc Flash), and 110 (Emergency Power)
IEEE 446 (Emergency Systems), 1100 (Powering and Grounding), 446 (Reliability)
Factory-approved procedures for APC, Eaton, Vertiv, Schneider, and all major brands
Partner with experienced professionals who ensure your UPS system is installed correctly, commissioned thoroughly, and ready to protect your critical operations.